Chapter 1065
Snack City, to be precise it should be Food City, in the future, it will be a gourmet city on earth.
So for this snack city, Li Linfei relied on the two buildings as a starting point, and the land in a few hundred kilometres around was acquired together just to build the attraction.
Li Linfei pondered for a moment and continued, "Well, you guys are thinking about just making more money and want to make everything high and mighty, and that's right."
"However, you must pay attention to the fact that this is the scenic spot as a whole, maybe in a certain piece did not make money, loss is also fine, can make up from other places."
"Catering has to be expensive of course, there should also be cheap, try to consider some more of those at the bottom, like many student parties, they have not graduated yet, failed to make money, travel consumption must be strapped for some."
Li Linfei continued, "Well, the snack city piece, software facilities are also very important, so many snack shops, how about the tourists quickly find their favorite, I hope the operation department put more effort."
There are so many people needed for the tourist staff, Li Linfei asked again, "How is the progress of recruiting staff for other departments?"
As soon as Li Linfei's voice fell, Liu Zi narrated, "The staff of the tourism company has increased from the initial 40 to 50 people to the current 500, including 50 in the human resources department and 50 in the engineering department mainly for technical and training staff."
Li Linfei nodded as he listened and then asked, "How is the recruitment of logistics staff and the ecological park going?"
Liu Zi spoke eloquently and had everything in mind, "Hotel logistics staff, the Wenlin Hotel has provided more than two thousand people, recruited from the city as well as nearby counties, roughly 10,000 people, and plans to start later this month, preparing for a three-month training period."
"Ecological Park is currently in the construction period, livestock farms, probably need 1,500 various types of personnel, vegetable base probably need 1,000 workers Ecological Park estimates the need to recruit 4,000 various types of professional staff."
The other people in the meeting room listened to Liu Zi's lively speech for half a day, like a clear trickle of water, pervasive irrigation of their hearts, reverie about what this ecological park is really like.
The ecological garden is arranged to the southwest of the two buildings, it is also a major tourist attraction for the Future Technology Group, but also to replenish the raw materials for the food and drink needed for the attraction more quickly, about one third of the food and drink supplies can be provided, mainly for high-spending travellers, the rest is through procurement.
The ecological park of the Future Technology Tourism Company will be green, ecological and environmentally friendly, with the effective use of resources as the carrier, supported by scientific and technological innovation and market-oriented operation, integrating deep processing of agricultural production and sightseeing tourism.
The operation will adopt the breeding - biogas pool - planting - mushroom model, the biogas pool is the core of the model, playing a pivotal role in connecting breeding and planting, production and living with energy, to achieve the four types of species, breeding, mushroom, energy as one; production, life, life interest (leisure and tourism) three "life" in one.
At the beginning, Li Linfei did not want to build an ecological park, he just wanted to have a logistics factory, which could supply part of the future scenic spot's material consumption.
Later, he thought that with the accelerated pace of urbanisation and industrialisation, changes in the urban living environment and increased work pressure, agro-tourism has a strong vitality and development potential, so the logistics factory was changed directly into an eco-park to increase the characteristics of the future technology tourism scenery.
The raw materials for the high-end food in Snack City will also come from the Eco Park, and visitors will surely want to know how those high-end foods are farmed out.
The Future Technology and Tourism Company's Eco Park is a 5 billion rmb investment, covering a total area of about 15,000 acres.
Among them, the eco-pig farm, which is planned to produce 100,000 head of meat pigs a year, has an investment of 300 million rmb and covers an area of 600 mu, which can supply the meat needs of 150,000 people for a year.
Among the personnel recruited for the eco-pig farm, like breeders (gestation sow breeders, lactation sows, piglet breeders, auxiliary breeders, nursery pig breeders, growing fattening pig breeders), night shift personnel, team leaders, farm leaders, production line supervisors, logistic personnel (such as logistic supervisors, accountants, drivers, maintenance, security guards, cooks, handymen) will need four hundred people.
10,000 head of cattle farm plans to invest 300 million, the personnel required 400, other base's such as vegetable base covers an area of 5,000 acres, plans to invest 200 million rmb, even if the fully automatic irrigation, will need thousands of workers.
There are also fruit bases, chickens, ducks, geese, sheep and other livestock meat base construction. Of course, the ecological park is not only these, but also with the concept of green ecology and industrial operation as the goal.
Therefore, the landscape construction must be very much, so it is normal to say that several thousand people will be needed for the eco-park.
The eco-park is planned to have a construction cycle of one and a half years, and the bases with the fastest returns are estimated to be in regular operation by the end of the year, such as the vegetable base, which has a very short construction cycle and can be harvested in two or three months. But like the pig farm and cattle farm, in addition to the base construction, the light into the meat period will take more than five months, so it will take at least a year before the normal supply of raw meat.
Li Linfei is also very much looking forward to the future ecological park, which, in terms of scale, must be the first in the world, and the attractions inside must also be built to be the first in the world.
There, one can get close to nature, enjoy the sun, challenge oneself and feel the joy of childhood!
In spring, you can carry baskets to pick tea, vegetables to dig bamboo shoots, look for wild vegetables and mushrooms, and enjoy the scent of spring.
In summer, you can play in the water, swim, fish and touch shrimps in the yaoi pond, which is one of the features of the Eco Park in summer.
In autumn, enjoy the joy of the harvest by picking the fiery red persimmons, red dates and chestnuts that fill the hills themselves
In winter, you can build snowmen and have snowball fights amidst the white make-up and enjoy the endless fun of nature! Gather around a roaring bonfire, have a bite of mountain hotpot and a sip of mellow grain wine, the taste will surely be unforgettable!
Wild garlic, wild celery, pumpkin tips, ground lettuce and wild bamboo leaf lettuce have never been sprinkled with pesticides and are grown naturally. There will be seeded pumpkins and purple potatoes that people haven't seen since they were children.
Strolling along the paths around the hills, the fruit groves and vine shelves are green and fruitful.
Walking through the farm's own vegetable gardens, with their dazzling green leaves and fragrant red fruits, it was like being immersed in a paradise.
Li Linfei's thoughts drifted a little further away, squinting his eyes and resting his chin as he wandered through the ecological garden he had built for several minutes.
Chapter 1066
The people at the bottom saw that the big boss looked as if he was thinking and should be in deep thought, so they didn't dare to disturb him.
Li Linfei woke up in a daze and realized that he had lost his temper, and smiled in embarrassment: "Sorry, I was too lost in thought, I had a beautiful dream, whether this ecological park can be realized, it depends on everyone, by the way, how is the recruitment of materials for the tourism company going?"
The middle and senior management of the two branches in the meeting room, hearing the boss's words, all of them couldn't help but laugh, never thought that the boss could still desert in a meeting. However, it was estimated that he was the only one who dared to desert for almost several minutes like this.
As the head of the material procurement department, he hurriedly got up and bowed to Li Linfei, then sat down and reported, "In terms of dietary materials, the technical department has already started contacting the farmers near Xiangzhong City, and it is estimated that the list of farmers to cooperate with will be finalised in July."
"Ensure that the food and beverage supplies can be supplied normally after the opening of the tourist attractions. For other material purchases, the bidders' information is being reviewed."
"Well, material bidding, must be strict, if found cheating, eating and drinking to take the phenomenon and also the phenomenon of counter-subsidy kickbacks, I will definitely not condone such behavior, the law to deal with the law to deal with."
Li Linfei had to remind these material procurement department, many companies, material procurement on the oil and water is very big, often take kickbacks, the future of technology tourism company's material procurement is not tens of millions or hundreds of millions, may be a year down tens of billions of material procurement is normal.
If the purchaser's annual salary is very low, in the selection of materials will most likely choose to bribe his company.
The use of tenders for the procurement of supplies would have prevented this kind of fraud, but it could not have been completely stopped; there are always people who take the path of crime for money.
The high salaries of the Future Technology Group may have a certain effect in preventing corruption, but it is inevitable that individuals will do white knuckles for more money.
"At the same time, remind those bidders that if they carry out bribery of our company's personnel, they will be disqualified from bidding, and if any company personnel are found trying to receive kickbacks, our company will reward those bidding companies, of course, there must be solid evidence!" Li Linfei solemnly reminded, his tone extremely stern.
The people who heard it all looked a little nervous and had to hang a hanging needle over their heads, reminding themselves never to take the road of corruption and to remind their families when they got home that they must not get themselves into trouble.
Li Linfei secretly thought: supervision and counter-supervision is probably the best way to go, and time will tell how effective corruption prevention will be.
"Okay, boss." Han Bin, who was the minister of the tourism company's logistics service centre, could not help but shiver inwardly as he watched his boss speak very seriously, but the anti-corruption method he described was indeed a good one.
"General Chen, report on the progress of the construction of the scenic spot." Li Linfei asked as soon as the peak of his words turned to Chen Lin, the head of the engineering department.
Chen Lin heard his boss gesture and after a slight bow, he pulled out his coaxing voice and said, "Yes, boss, the ski resort scenic area is progressing 50%, the foundation of the ropeway and ski trail have been laid, flowers and plants are being planted, the next step is mainly the construction of supporting facilities and commissioning."
"It is expected that by the beginning of August, all facilities will be completed. The maple forest, bamboo forest and lavender botanical garden will probably be finished planting in July, and the supporting facilities have been installed and are in the process of commissioning."
"Most of the hotels have dug their foundations and the ones that are progressing fast have been built up to ten floors and can be topped off in early August, with the aim of completing the renovation of some of the numbered bodies and entering into use on the National Day."
"The construction of the food city is not very difficult, to ensure that the renovation is completed by September, the national day can enter into trial operation."
"Parking lot, it is estimated that the construction can be completed in August. Customer service centre, November can be in trial operation, supermarkets and shopping malls may be slower, needing until December."
"Square is currently in the roadbed construction, laying frame tram tracks, the slowest is the highway, because the scenic area is too large, hope in December can complete the opening of the four channels, if not, can only try other national highways and provincial roads first."
After hearing this, Li Linfei said that the speed of construction was indeed very rapid and could be said to have reached its limit, with three shifts and various construction companies making every effort to do it seriously.
After all, this is only the first phase of the project, do a good job, it is very likely to receive the second phase, the third phase, and even the fourth and fifth phase of the project bid smoothly.
In the first phase of 200 billion, the motorway alone will cost nearly 80 billion, and an eight-lane motorway will cost nearly 200 million rmb per kilometre.
The hotels built will need to accommodate hundreds of thousands of people, and if the construction unit is apportioned at an average of 20 square metres per person (including the communal area), half a million people will need to build 10 million square metres, i.e. 250 buildings like the 40-storey Future Technology Building, and if the cost of each square metre of construction is 1,500 yuan (before decoration and land prices), it will also cost at least 15 billion rmb.
Two hundred billion, it looks like a lot of money, it sounds and feels exaggerated, but if you want to build a new new city, it's really not much when you do the math, it might not be enough.
"Let me make a suggestion, we must build more supporting facilities, we have a wide scenic area. If it's like those scenic spots in China, it's hard to find a wc, or it's hard to find a place to land, you can still sit on the rocks or lawn in the scenic spot, what if it's a food city, do you tell tourists to sit on the ground?"
Li Linfei also has not been to any scenic spots, except for Orange Island is Yue Lu Mountain, he also looked at the construction of supporting facilities in various famous scenic spots in China, probably to understand the situation.
"WC must be sufficient, prefer to build more, try to let tourists less queue, or even do not have to queue, originally play well, but unfortunately this thing a rush, the result is not cool, right!"
Li Linfei just finished, everyone in the conference room really can't hold it, can't help but bend over laughing, the conference room of the middle and high level, often go to travel certainly more than Li Linfei understand the operation of those scenic spots, it is estimated that they themselves are also being one of the sufferings.
Li Linfei also does not care about the people underneath laughing, then said: "Do not three hundred meters within the wc can not find, own calculations under the general people to walk three hundred meters to take how long, have to two minutes, right, not counting the queue, I do not know how long you can hold. Anyway, I personally think there should be a WC within 100 meters, as for the size, just estimate whether the tourists are concentrated in that location."
Everyone was laughing and thinking that what Li Linfei said was indeed the truth, those scenic spot developers must have thought of this, but in order to reduce development costs, they saved as much as they could.
Li Linfei continued, "Customer service centre, food city, seating must be enough, space wide enough, eating well, must be comfortable, too many people, taste food mood naturally will not be."